The INTRUPTor System upgrades biogas produced from organic wastes into renewable natural gas.
Home

CORE PRODUCT LINES
INTRUPTor™ Mobile Solution Centre
INTRUPTor Mobile Solution Centre
The INTRUPTor Mobile Solution Centre unlocks access to RNG production for dispersed feedstocks and produces RNG onsite for local fueling needs or to a virtual pipeline system. This turnkey mobile unit can travel to the biogas facility at regular scheduled times, collect the RNG, and offload it onto a truck which will transport it to the pipeline injection site.
Flow Rate: 40 –100 Nm3/hr (25–65 SCFM)
Price: Typically 20% – 50% lower than conventional solutions, for accurate estimate please complete application form.
Lead Time: 6 – 8 months
Get a Quote

CORE PRODUCT LINES
INTRUPTor™ – Mini
The INTRUPTor – Mini provides biogas upgrading with flow rates from:
100 – 220 Nm3/hr (65– 140 SCFM)
Price: Typically 20% – 50% lower than conventional solutions, for accurate estimate please complete application form.
Lead Time: 6 – 8 months
Get a Quote

CORE PRODUCT LINES
INTRUPTor™ – Mid
The INTRUPTor – Mid provides biogas upgrading with flow rates from:
220 – 1200 Nm3/hr (140 – 750 SCFM)
Price: Typically 20% – 50% lower than conventional solutions, for accurate estimate please complete application form.
Lead Time: 9 – 14 months
Get a Quote

CORE PRODUCT LINES
INTRUPTor™ – Max
The INTRUPTor – Max provides biogas upgrading with flow rates from:
1200 –3800 Nm3/hr (750 –2370 SCFM)
*For larger projects multiple Max units can be used
Price: Typically 20% – 50% lower than conventional solutions, for accurate estimate please complete application form.
Lead Time: 14 – 20 months